Skip to content

AI Risk Atlas · original editorial working note

The grid has a location

Original interpretation under editorial review. Not a verified risk assessment, published incident report, or measured trend.

Working draft · independent review pending

This note preserves its source links and editorial hypotheses, but its factual claims have not completed independent editorial review. Do not treat it as validated incident evidence.

The footprint of AI cannot be inferred from one global per-query number. Local electricity systems, equipment lifetimes, cooling, utilization and what the AI replaces all change the calculation.

Evidence and limits

The IEA's 2026 outlook projects global data-center electricity demand rising from approximately 485 TWh in 2025 to 950 TWh in 2030. The projection includes non-AI uses; it must not be attributed entirely to AI.

Investigative question

Separate measured use from forecasts. Compare actual deployment choices and regional constraints. Ask for total system demand and a realistic non-AI or smaller-model alternative.

Control architecture

Publish measurement scope and uncertainty, optimize inference use and test efficient, local or shared infrastructure when it is a genuine fit.

Connected entries

MR-044 · MR-047 · MR-054

Sources

Cyber Agency original editorial draft. Source taxonomy by MindXO (CC BY 4.0), independently derived from the MIT AI Risk Repository. This brief does not assign a global severity, incidence count or trend. Editorial/source review is required before public publication.

Back to licensed risk record MR-037